Extensive roofing works for new Docklands development
Brown roof and more than 500 balconies fitted on new 42-floor A2/A3 block at Wood Wharf.
Overview
Name: Wood Wharf
Client: Canary Wharf Contractors
Type: Roofing
Duration: 18 months
Value: £2.59m
Scope
- 526 balconies waterproofed using Bauder Cold applied systems
- 526 fitted using Hyperion plastic decking including three large terrace areas
- A brown roof installed on the 42nd floor using Eco Green Roofs
- Four roof areas waterproofed using Bauder Hot Melt systems finished with ballast and paving
- Waterproofing the perimeter of the building using Bauder Hot Melt systems
Benefits
- Effective COVID safety measures implemented quickly
- Delays minimalised
- No extra cost to client because of COVID-related issues
Contact
Social Media
Resident Portal
Elkins Construction is registered as A&E Elkins Ltd. Registered Office: A&E House, Unit 1a Industrial Trading Estate, Juno Way, London, SE14 5RW
Registered in England and Wales No.00846751
©2023 Copyright A&E Elkins Ltd